-
BVC Set of connection parts for a VHCpro
- Hose nozzle
- Minimized foam and aerosol formation
-
ME 16C NT, MD 12C NT, MV 10C NT Upgrade kit exhaust vapor condenser
- Upgrade kit for NT series
-
AK 500 / KF DN 25 Inlet separator AK with round bottom flask 500 ml, with connections KF DN 25 and hose nozzle DN 15 mm
- Compact and leak-tight
- High conductance
- Easy draining of condensate
-
SW 6/10mm Drain for exhaust vapor condenser, with KS 35
- Drain for exhaust vapor condenser
-
VACUU·BUS® Extension cable VACUU·BUS® 10 m
- Mains plug VACUU·BUS®
- Cable length 10 m
-
EK 600 Base module for chemistry pumping unit (without pump)
- For VACUU·PURE®
- Inlet small flange KF DN 25
- Outlet hose shaft DN 19 mm
-
AK 500 / KF DN 25 VACUU·PURE Inlet separator AK with round bottom flask 500 ml, with connections KF DN 25 and hose nozzle DN 15 mm, Leakage rate 10^-4 mbar l/s
- Compact and leak-tight
- High conductance
- Easy draining of condensate
-
G1/4a D15.5 PE Filter for air inlet for VACUU·PURE (3x)
- Suitable for VACUU·PURE®
-
Blind plug Blind plug for VACUU·PURE® 10
- Suitable for VACUU·PURE® 10
-
VACUU·CARE 24 months warranty for diaphragm pumps
- 24 months warranty
- All spare parts included
- For diaphragm pumps
-
VACUU·CARE 36 months warranty for diaphragm pumps
- 36 months warranty
- All spare parts included
- For diaphragm pumps
-
Measuring device adjustment 0.001 mbar
- Adjustment and documentation up to 0.001 mbar
- On-site testing by our qualified staff
- No shipping of your device necessary
-
Measuring device adjustment 0.1 mbar
- Adjustment and documentation up to 0.1 mbar
- On-site testing by our qualified staff
- No shipping of your device necessary
-
DGUV V3 Inspection
- DGUV V3 testing of your equipment
- On-site testing by our qualified staff
- No shipping of your device necessary
-
Vacuum Check all manufacturer
- Testing of all manufacturers
- On-site testing by our qualified personnel
- No shipping of your equipment necessary
-
Installation Installation and commissioning
- Professional installation & commissioning
- Test run with testing and documentation
- Instruction of your employees
-
Maintanance Vacuum pump
- Measures according to actual need
- Use of original spare parts
- Vacuum test after each maintenance
-
Pump Inspection On-site inspection of your pump
- Measures according to actual need
- Vacuum test after each maintenance
- On site inspection